Patent-protected · South Africa & India

Every passing truck is an untapped power plant

Magnus-effect bladeless wind turbines harvest vehicle-induced wind along India's 150,000+ km highway network. No blades. No noise. Paired with solar. Pure physics meets infrastructure.

2 m/s
Cut-in speed
150K+
km highways
Zero
Competitors (India)
24/7
Wind from traffic
Begin the story
01 The Invisible River

A river of wind flows along every highway — and nobody is capturing it

Every truck at 60 km/h creates a 4–8 m/s wind pulse. Multiply by 50,000 vehicles/day across 150,000 km of highways — an energy resource hiding in plain sight.

↑ Animated: trucks generate wind pulses harvested by roadside MVAWT turbines

🌬️ The wind is already there

Research confirms: heavy trucks create wind of 4–8 m/s at just 1 meter from the road edge. Thousands of energy pulses per hour on any busy expressway.

⚡ Conventional turbines can't harvest it

Traditional turbines need 5+ m/s to even start. They're designed for hilltops — not chaotic, low-speed, multi-directional highway turbulence.

🔮 Until now

Magnus-effect turbines start at 2 m/s and capture wind from all directions. Purpose-built for the exact conditions highways create.

02 The Physics

The Magnus effect — nature's hidden force, weaponized for energy

In 1852, Heinrich Gustav Magnus discovered that a spinning cylinder in airflow experiences lateral force. The same physics curving a footballer's free kick can generate electricity from the lightest breeze.

↑ Live: spinning cylinder deflects airflow → low pressure above → LIFT force

How it works

A cylinder spins in moving air. One side accelerates airflow (low pressure), the other decelerates it (high pressure). The pressure difference creates lift — up to 14× the lift of a conventional airfoil.

Why not blades?

At 2–5 m/s, airfoil blades suffer laminar separation and stall. Spinning cylinders overcome this by injecting momentum into the boundary layer — producing 3× more power in low wind.

Battle-tested

Challenergy (Japan) commercially deploys Magnus VAWTs. Their unit survived Typhoon Chanthu — Category 5, gusts of 84 m/s. The technology is validated.

03 Our Innovation

Bladeless. Silent. Solar-crowned. Built for India's roads.

Each unit integrates spinning cylinders with a solar panel on top — the world's first highway-optimized wind-solar hybrid. Engineered for extreme heat, monsoon, dust, and millions of vehicles.

↑ MVAWT concept — rotating cylinders + solar crown on vertical axis
6 decisive advantages

↓ Low-wind dominance

Generates from 2 m/s. Produces 3× more power than bladed turbines in the 2–5 m/s highway wind zone.

⊕ Omnidirectional 360°

Vertical axis captures wind from all directions. No yaw mechanism needed for chaotic highway turbulence.

◇ Zero blade-throw risk

Solid cylinders can't fragment. Self-regulating in storms. Tested to 84 m/s. Inherently traffic-safe.

♫ Silent (52 dB)

Highway noise (70–80 dB) completely masks turbine sound. Zero community opposition.

🕊 Bird & wildlife safe

No blade-tip kill mechanism. Visible cylinders at low speed. Clean energy that's actually clean.

☀ Wind + Solar hybrid

Wind peaks in monsoon when solar drops. Traffic wind at night when solar sleeps. Combined: 50% capacity utilization.

04 Head-to-Head

Magnus bladeless vs conventional bladed

Every metric that matters for highway deployment favors Magnus.

MetricMagnus MVAWTConventional
Cut-in wind speed2 m/s5+ m/s
Operating range2–40 m/s5–25 m/s
Noise at 25m~52 dB60–70 dB
Bird fatalitiesZero1.17M/yr (US)
Blade throw riskImpossiblePresent
Wind directionOmni 360°Needs yaw
Storm survival84 m/s testedShutdown >25
Highway suitabilityPurpose-builtNot designed
Low-wind output (2–5 m/s)3× conventionalZero / minimal
05 Where They Go

India's highways are a sleeping wind farm

Expressway medians, ghat crests, toll plazas — thousands of kilometers where wind flows constantly.

146,342
km National Highways
6,059
km Expressways
₹7,700 Cr
Addressable Market
50,000
km Vision 2047
↑ Animated: ghat road deployment — monsoon winds 8–20 m/s + truck wind wash

🏗️ Samruddhi Expressway

701 km, India's first solar highway. MSRDC seeks wind-solar hybrid. 204 MW solar planned. Our #1 target.

⛰️ Western Ghats

Bhor, Kasara, Tamhini Ghats. Orographic winds 8–20 m/s in monsoon. 2–3× flat highway averages.

📋 SECI × NHAI MoU

Nov 2025: first national partnership for highway renewable energy. Legal precedent established.

🚂 Railways, Smart Cities, Defence

Railways net-zero by 2030. 100 Smart Cities. Remote posts. ₹5,000+ Cr parallel markets.

06 Government Strategy

From startup to state partner

DPIIT + MSME registrations give us procurement superpowers. NIWE certification builds the credibility moat.

⊞ DPIIT + MSME

80% patent fee cut. EMD exemption. 25% procurement preference. 3-year tax holiday. These are competitive weapons large companies can't access.

⊡ GeM + CPPP

Direct sales to all govt agencies. 15% price preference. Relaxed experience criteria for MSMEs. The marketplace where government shops.

⊠ NIWE Certification

IS/IEC 61400-2 type testing. ALMM listing for all govt projects. ₹15–30L, 12 months. The moat separating serious players from hobbyists.

⊗ MSRDC Pilot

Approach JMD directly with tech demo for Samruddhi Expressway. Shape tender specs around Magnus-effect. Partner, not vendor.

PPP / BOOT

Deploy on govt land, sell power at ₹3–4/kWh. The model MSRDC already uses for solar.

CSR Funding

Section 135 lists renewable energy as eligible CSR. Target: Tata, NTPC, ONGC, Adani.

Energy-as-a-Service

Deploy free, charge per kWh. Recurring revenue, higher lifetime value.

07 Execution

36 months from zero to government contract

Every phase has a gate. Every rupee accounted for. Each milestone unlocks the next round.

Months 1–3 — Foundation

Register. Patent. Simulate.

Pvt Ltd via SPICe+. DPIIT + MSME + GST. Patent under SIPP (₹5,600). CFD with Zeus Numerix. Apply Venture Center Pune.

₹4–5 lakh
Months 4–6 — Validation

Simulate. Model. Test.

CFD gate: Cp > 0.15 → proceed. Scaled model via 3D printing. First hire. Investor outreach: Climate Angels, IAN, Social Alpha.

₹12–16L cumulative
Months 7–12 — Prototype

Wind tunnel. Full build. Power up.

IIT Bombay wind tunnel. 1 kW prototype + 400W solar. Field testing. Close seed (₹1–2 Cr). First MSRDC meeting.

₹34–46L cumulative
Months 13–18 — Certification

NIWE testing. Pilot proposal.

Submit NIWE application. Formal proposal to MSRDC for Samruddhi. GeM + CPPP registration.

External funding
Months 19–24 — First Deployment

5–10 units on a live highway.

Pilot order. Pune contract manufacturing. IoT dashboards live. First PPA revenue. Media campaign.

⚡ First revenue
Months 25–36 — Scale

100+ unit government contract.

Win MSRDC/NHAI contract. Series A (₹5–20 Cr). 100-unit batch manufacturing. Team scales to 20+.

₹5–20 Cr Series A
08 Capital Strategy

Backed by India's climate capital

Sequenced funding — each rung unlocked by the previous milestone.

Pre-Seed · Grants

₹10–50L — Zero equity

DST NIDHI PRAYAS, SISFS, MNRE Call for Proposals, BIRAC BIG. Pure runway, no dilution.

Seed · Angels

₹1–2 Cr — 15–25%

Climate Angels, IAN, Speciale Invest, Social Alpha. Triggered by working prototype + field data.

Series A · VC

₹5–20 Cr — Post-pilot

Avaana Capital, Infuse Ventures, India Deep Tech Alliance. Triggered by pilot data + govt LOI.

Revenue · Customers

PPP, PPA, EaaS

Sell (₹2–3L/unit), lease (₹3–4/kWh), or EaaS. IRB, L&T, Smart Cities, Railways, defence.

The highway is waiting

India builds 28 km of highway every day. Each kilometer is a wind farm waiting to happen. Zero competition in the world's largest highway-building nation.

Explore on GitHub →